top of page


KAILEY GRIFFIN

Tempe Hardware Reclamation Project
The Tempe Hardware Reclamation Project was the rejuvination of an existing historic building on Mill Avenue in downtown Tempe. We adapted this building to a community center and senior living complex. Because of the buildings historic status, the exterior and existing ballroom have been left original in the remodel and a fourth and fifth floor have been added on to the building with minimal structural support from the existing building. The remodel focused on bringing in light and nature into the building through the addition of an atrium and the development of other light collecting techniques.
In collaboration with Olivia Munoz, James Yu & Erica Thompson





Retail Space on Ground Floor


Blue Moon Cafe on Ground Floor
Ground Floor Plan


Back Patio, Community Garden and Ceramics Studio
Second Floor Plan


Second Floor Ballroom Entrance

Third Floor Studio and Mezzanine Gallery
Third Floor Plan

Ballroom and Mezzanine Gallery

Fourth and Fifth Floor Single Level Plan

Fourth and Fifth Floor Split Level Plan


Shared Kitchen in Residential Space
Shared Living and Dining in Residential Space

Rooftop Patio and Cooking Space
bottom of page